Sign In | Join Free | My gimpguru.org
China Qingdao KXD Steel Structure Co., Ltd logo
Qingdao KXD Steel Structure Co., Ltd
Verified Supplier

1 Years

Home > Steel Structure Hangar >

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

Qingdao KXD Steel Structure Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

Brand Name : KXD

Model Number : KXD-SW22

Certification : ISO9001:2008

Place of Origin : China Qingdao

MOQ : 200 square meters

Price : USD 40-85 Per Square meter

Payment Terms : T/T, L/C

Supply Ability : 5000-9000 tons Per Month

Delivery Time : 35-55 days

Packaging Details : steel pallet & wooden box or in bulk

Profile : Hot rolled H steel / Weld H steel

Material : Q355b, Q235b

Technician : Free technical support

Design : Custom exactly as the demands

Drawing : 3D model and installing drawing available

Production : Finished for direct install support

Coating : Alkyd painting, Epoxy painting, Hot dip galvanized

Insulation : EPS, Glasswool, Rockwool, PU on option

Standard : Different standards on option as demands

Install : Online guide support & On-site install

Service life : 30-50 years

Visit : Workshop visit and check available

Contact Now

Customized High Rise Prefabricated Metal Frame Steel Building Structure Hangar

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized
Details 1. Size (Length* Width* Eave height, roof slope) : MOQ as 200sqm

2. Type: Single slope, Double slope, Multi slope

Single span, Double span, Multi span

Single floor, Double floors

3. Base: Cement and Steel foundation bolts

4. Column & Beam: Q345(S355JR) or Q235(S235JR) steel, all bolts connection!

Straight cross-section or Variable cross-section!

5. Bracing: X-type or V-type or other type bracing made from angle, round pipe, etc
6. C or Z purlin: Size from C120~C320, Z100~Z200

7. Roof and wall panel:

Single steel sheet: thickness 0.326~0.8mm

Sandwich panel: thickness 50mm~100mm

8. Accessories: Semi-transparent skylight belts, Ventilators, down pipe, galvanized gutter, etc

9. Surface treatment of steel:

2 layer epoxy zinc rich primer and 2 layer antirust paint

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

Three-steps to control steel structure projects quality

First step, Materials

Strict control of materials is the first step.

Before the production and process of steel structure components, we should check whether the steel type, specification and quality of the steel meet the designed requirements and standards, and use it after confirming that it is qualified.

High-strength bolts, ordinary bolts, and qualified welding rods, welding wires and fluxes are selected according to the steel grade, all are should be paid attention.

Step two, Installation

The installation method of steel structure projects is very important.

After the anchor bolts are leveled, connect them in accordance with regulations. First install a column beam, then the support is installed to form a system. After that one span is finished, the next span is started. This installation is safe and without any hidden dangers. The positioning of the steel column must be accurate. The elevation of the top of the column must be consistent and on the same straight line. The correct connection method and reasonable design of the connection form play an important role in the installation of steel structures.

Step three, Technology

No matter how good the material is and how best the method is, the construction personnel must have rich experience in construction technology. The technology and qualifications of welders and crane workers must be checked and guaranteed. At the same time, the project department is required to establish a quality assurance system and technical personnel shall be certified.

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized

Preparation Of Steel Structure Construction

⑴Technical Preparation:Develop the installation technical plan.

The single-layer steel structure project should adopt the separate installation method. The roof system should adopt the comprehensive installation method. Multi-layer steel structure project generally adopts comprehensive installation method.

⑵Construction equipments and materials Preparation

Including hoisting machinery, various auxiliary construction equipment, steel structure components, various welding materials and fasteners, etc.

⑶ Column foundation inspection

Column foundation leveling and elevation control; Review the axis and spring up the alignment line;Check the axis position, size and quality of the anchor bolt.

⑷ Component cleaning

clean up the steel pillars and other lifting steel components in advance; Nnumber them and mark the installation line.


Product Tags:

High Rise Steel Structure Hangar

      

Steel Structure Hangar Customized

      

Prefabricated Metal Frame Hangar

      
Quality High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized wholesale

High Rise Steel Structure Hangar Building Prefabricated Metal Frame Hangar Customized Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao KXD Steel Structure Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)